Skip to content
Home
About
Collections
Gallery
Resources
Installation Instructions
Terms Of Services
Privacy Policy
Shipping Policy
Contact
$
0.00
0
X
Installation Instructions
MailStand Installation Instructions
Required Materials and Tools:
2 bags of QUIKRETE Concrete Mix
Shovel (for digging the hole)
Water (as specified on the Quickrete packaging)
Construction mixer or drill attachment (for mixing the concrete)
Level (for accurate alignment)
Recommended Hole Dimensions:
Depth: 18–22 inches (45–55 cm)
Diameter: 6–8 inches (15–20 cm)
Installation Process:
Dig a hole according to the specified dimensions.
Place the MailStand in the center of the hole.
Use a level to ensure the structure is vertically aligned.
Prepare the concrete mix following the manufacturer’s instructions.
Carefully pour the concrete around the base of the MailStand.
For the first 15–20 minutes after pouring, adjust the position if needed.
Allow the concrete to fully cure. Do not apply any load to the MailStand until the curing process is complete.
0
0
Your Cart
Your cart is empty
Return to Shop